Mining planning integration with dispatch of trucks (2004)
- Authors:
- Autor USP: TOMI, GIORGIO FRANCESCO CESARE DE - EP
- Unidade: EP
- Subjects: TRANSPORTE EM MINAS (PLANEJAMENTO;OTIMIZAÇÃO); SOFTWARES (USO); CAMINHÕES
- Language: Espanhol
- Imprenta:
- Publisher: Universidad de Chile/Pontificia Universidad Catolica de Chile/Universidad de Santiago de Chile
- Publisher place: Santiago de Chile
- Date published: 2004
- Source:
- Título do periódico: MININ 2004
- Conference titles: Conferencia Internacional de Innovación en Minería
-
ABNT
PEREIRA, Sandro Lucena e NASCIMENTO, André e DE TOMI, Giorgio Francesco Cesare. Mining planning integration with dispatch of trucks. 2004, Anais.. Santiago de Chile: Universidad de Chile/Pontificia Universidad Catolica de Chile/Universidad de Santiago de Chile, 2004. Disponível em: https://repositorio.usp.br/directbitstream/dd548fb1-2ee0-42c5-9375-9aaa7982eb28/Tomi-2004-Mining%20planning%20integration.pdf. Acesso em: 21 maio 2024. -
APA
Pereira, S. L., Nascimento, A., & De Tomi, G. F. C. (2004). Mining planning integration with dispatch of trucks. In MININ 2004. Santiago de Chile: Universidad de Chile/Pontificia Universidad Catolica de Chile/Universidad de Santiago de Chile. Recuperado de https://repositorio.usp.br/directbitstream/dd548fb1-2ee0-42c5-9375-9aaa7982eb28/Tomi-2004-Mining%20planning%20integration.pdf -
NLM
Pereira SL, Nascimento A, De Tomi GFC. Mining planning integration with dispatch of trucks [Internet]. MININ 2004. 2004 ;[citado 2024 maio 21 ] Available from: https://repositorio.usp.br/directbitstream/dd548fb1-2ee0-42c5-9375-9aaa7982eb28/Tomi-2004-Mining%20planning%20integration.pdf -
Vancouver
Pereira SL, Nascimento A, De Tomi GFC. Mining planning integration with dispatch of trucks [Internet]. MININ 2004. 2004 ;[citado 2024 maio 21 ] Available from: https://repositorio.usp.br/directbitstream/dd548fb1-2ee0-42c5-9375-9aaa7982eb28/Tomi-2004-Mining%20planning%20integration.pdf - Modelagem digital de terrenos. (em CD-Rom)
- Metodologia para estimativa e gestão da produtividade de lavra
- Management model PDCA 90-10 applied to open pit mine operations: practical example: Phosphate mine at Araxá, MG-Brasil
- Technical and operational aspects of tunnel rounds in artisanal underground mining
- The mine value chain integration beyond the ERP systems
- Challenges in the feasibility of bituminous shale as a source of oil
- Design of costs-based metrics for enhancing the economics of the mining truck fleet
- Usp e Ibram lançam plataforma para identificar a origem do ouro vendido no Brasil. [Entrevista a Malu Mazza]
- Improving the monitoring, control and analysis of the carbon accumulation capacity in legal reserves of the amazon forest
- The challenge for achieving sustainable development through responsible small-scale mining in indigenous areas in Brazil
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
Tomi-2004-Mining planning... | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas