Assembly line worker integration and balancing problem (2012)
- Authors:
- Autor USP: COSTA, ALYSSON MACHADO - ICMC
- Unidade: ICMC
- Subjects: OTIMIZAÇÃO COMBINATÓRIA; PESQUISA OPERACIONAL
- Language: Inglês
- Imprenta:
- Publisher: SOBRAPO
- Publisher place: Rio de Janeiro
- Date published: 2012
- Source:
- Título do periódico: Anais
- Conference titles: Simpósio Brasileiro de Pesquisa Operacional - SBPO 2012
-
ABNT
MOREIRA, Mayron César de O et al. Assembly line worker integration and balancing problem. 2012, Anais.. Rio de Janeiro: SOBRAPO, 2012. Disponível em: http://www.din.uem.br/sbpo/sbpo2012/pdf/arq0172.pdf. Acesso em: 07 jun. 2024. -
APA
Moreira, M. C. de O., Miralles, C., Costa, A. M., & Costa, A. M. (2012). Assembly line worker integration and balancing problem. In Anais. Rio de Janeiro: SOBRAPO. Recuperado de http://www.din.uem.br/sbpo/sbpo2012/pdf/arq0172.pdf -
NLM
Moreira MC de O, Miralles C, Costa AM, Costa AM. Assembly line worker integration and balancing problem [Internet]. Anais. 2012 ;[citado 2024 jun. 07 ] Available from: http://www.din.uem.br/sbpo/sbpo2012/pdf/arq0172.pdf -
Vancouver
Moreira MC de O, Miralles C, Costa AM, Costa AM. Assembly line worker integration and balancing problem [Internet]. Anais. 2012 ;[citado 2024 jun. 07 ] Available from: http://www.din.uem.br/sbpo/sbpo2012/pdf/arq0172.pdf - Melhoria da confiabilidade da rede de distribuição de energia elétrica
- Análise da eficiência de linhas de produção com trabalhadores deficientes
- Optimization of the physical refining of sunflower oil concerning the final contents of trans-fatty acids
- Operations research/management science tools for integrating people with disabilites into employment: a study on Valencia's Sheltered Work Centres for Disabled
- Two extensions for the ALWABP: parallel stations and collaborative approach
- Influence of consumer purchasing behaviour on the production planning of perishable food
- Two-level network design with intermediate facilities: an application to electrical distribution systems
- Balanceando linhas de produção com trabalhadores deficientes e estações paralelas
- A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers
- Models and branch-and-cut algorithms for the steiner tree problem with revenues, budget and hop constraints
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas