Source: Engineering Optimization. Unidades: IME, EP
Subjects: OTIMIZAÇÃO COMBINATÓRIA, SCHEDULING
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
ABNT
BIRGIN, Ernesto Julian Goldberg e RONCONI, Débora Pretti. Heuristic methods for the single machine scheduling problem with different ready times and a common due date. Engineering Optimization, v. 44, n. 10, p. 1197-1208, 2012Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2011.634409. Acesso em: 23 abr. 2024.APA
Birgin, E. J. G., & Ronconi, D. P. (2012). Heuristic methods for the single machine scheduling problem with different ready times and a common due date. Engineering Optimization, 44( 10), 1197-1208. doi:10.1080/0305215X.2011.634409NLM
Birgin EJG, Ronconi DP. Heuristic methods for the single machine scheduling problem with different ready times and a common due date [Internet]. Engineering Optimization. 2012 ; 44( 10): 1197-1208.[citado 2024 abr. 23 ] Available from: https://doi.org/10.1080/0305215X.2011.634409Vancouver
Birgin EJG, Ronconi DP. Heuristic methods for the single machine scheduling problem with different ready times and a common due date [Internet]. Engineering Optimization. 2012 ; 44( 10): 1197-1208.[citado 2024 abr. 23 ] Available from: https://doi.org/10.1080/0305215X.2011.634409