A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers (2011)
- Authors:
- Autor USP: COSTA, ALYSSON MACHADO - ICMC
- Unidade: ICMC
- Subjects: OTIMIZAÇÃO COMBINATÓRIA; OTIMIZAÇÃO; PESQUISA OPERACIONAL
- Language: Inglês
- Imprenta:
- Publisher: SOBRAPO
- Publisher place: Rio de Janeiro
- Date published: 2011
- Source:
- Título do periódico: Pré-Anais
- Conference titles: Simpósio Brasileiro de Pesquisa Operacional
-
ABNT
CORTEZ, Pâmela Michele Cândida e COSTA, Alysson Machado. A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers. 2011, Anais.. Rio de Janeiro: SOBRAPO, 2011. Disponível em: http://www.xliiisbpo.iltc.br/pdf/87567.pdf. Acesso em: 19 abr. 2024. -
APA
Cortez, P. M. C., & Costa, A. M. (2011). A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers. In Pré-Anais. Rio de Janeiro: SOBRAPO. Recuperado de http://www.xliiisbpo.iltc.br/pdf/87567.pdf -
NLM
Cortez PMC, Costa AM. A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers [Internet]. Pré-Anais. 2011 ;[citado 2024 abr. 19 ] Available from: http://www.xliiisbpo.iltc.br/pdf/87567.pdf -
Vancouver
Cortez PMC, Costa AM. A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers [Internet]. Pré-Anais. 2011 ;[citado 2024 abr. 19 ] Available from: http://www.xliiisbpo.iltc.br/pdf/87567.pdf - An integer linear programming approach for approximate string comparison
- Production planning in a Beef meat packing plant
- Uma estratégia de solução para o problema de minimização do número máximo de pilhas abertas utilizando o problema do caixeiro viajante
- Two-level network design with intermediate facilities: an application to electrical distribution systems
- Balanceando linhas de produção com trabalhadores deficientes e estações paralelas
- Models and branch-and-cut algorithms for the steiner tree problem with revenues, budget and hop constraints
- Benders, metric and cutset inequalities for multicommodity capacitated network design
- A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem
- Complexity of decision making with multiple stakeholders
- Job rotation in assembly lines with disabled workers
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas